Requirements for the configuration and operation management of the sludge dewatering machine room
- 2020-09-03-

Requirements for the configuration and operation management of the sludge dewatering machine room


Configuration of sludge dewatering machine room:


The basic configuration of the sludge dewatering machine room is mainly composed of three parts, namely the sludge dewatering room, the sludge storage, and the power distribution control room.


The layout of the sludge dewatering room is mainly related to the area of ​​the sludge dewatering equipment and the sludge dewatering process. The common sludge dewatering room is equipped with a sludge flocculation device, a sludge thickening tank, a dosing pump, and a sludge feeding pump , Sludge dewatering equipment, screw conveyor (the sludge cake after deep dewatering is broken into blocks by screw conveyor), etc.


Operation and management requirements of the sludge dewatering machine room:


1. Appropriate sludge treatment chemicals should be selected;


2. The dosage of the sludge treatment agent should consider the nature of the sludge, the degree of digestion, the solid concentration and other factors, and it should be determined through experiments;


3. Determine the storage amount and storage method according to the type, validity period and storage conditions of the sludge treatment agent. The sludge conditioning agent should be used first.


4. The preparation of the medicament should meet the requirements of the dehydration process;


5. After the sludge is dewatered, the equipment and filter cloth should be rinsed clean.